Roofing repairs at Genet Elementary School.

The East Greenbush Central School District would like to provide an update on the Capital Project that was approved in 2017. To date, all of the major health and safety priority items have been completed at all schools as part of Phase I, including new fire alarm and carbon monoxide systems, new security cameras, a new card access entry system and a new public address system.

This summer, work continues as part of Phase II and III which includes replacement of bathrooms, HVAC systems, roofing, paving, masonry and lighting.

A full list of the Capital Project and the status of specific items can be found below.

Completed Projects

  • Card Access and Key Entry Systems – District-wide
  • Security Cameras – District-wide
  • Public Address Systems – District-wide
  • Telephone Systems – District-wide
  • Asbestos Abatement – District-wide (ongoing with other projects)
  • Wireless Access Points – District-wide
  • Fire Alarm System – District-wide
  • Refinished Gym Floors – Green Meadow and Red Mill
  • Replacement of original small toilet rooms in classrooms with code compliant toilet rooms, including associated abatement, supply and waste piping, fixtures, replacement of affected adjacent cabinetry in classrooms, finishes, etc. – Green Meadow and Red Mill (ongoing at Green Meadow and Red Mill)
  • Re-roofing of older sections of roof membrane – Red Mill
  • Reconstruction of service and north area paving – Red Mill
  • Replacement of hot water heating system – Green Meadow, Red Mill and Goff
  • Install ramp from west lower level (back) doorway elevation to grade – Red Mill
  • Replacement of failed air conditioning chiller unit and associated work – Goff
  • Removal of the utility company original transformer in the basement and installation of new on-grade utility company transformer with new underground wiring to the building – Green Meadow and Red Mill
  • Creation of gender-neutral toilet rooms with associated abatement, supply and waste piping, fixtures, finishes, etc. – Goff
  • Repair of exterior wall panels around Gym above the adjacent roofing – Goff
  • Reconstruction of large bus parking area paving – Transportation
  • Reconstruction of north area paving – Building & Grounds Shop
  • Provide daylighting controls on room lighting and replacement of failing occupancy energy management master controls on lighting – Red Mill
  • Selected areas of exterior masonry repair – Goff
  • Removal of abandoned interior water tanks in basement – Bell Top

In Process

  • Replacement of bathrooms with associated abatement, supply and waste piping, finishes, etc. in original group toilet rooms – Goff, Bell Top, Green Meadow and Red Mill
  • Renovation of Storage Room 212 into new bathroom – Genet
  • Re-roofing of older sections of roof membrane at Goff and Green Meadow – Goff, Bell Top, DPS and Green Meadow
  • Provide daylighting controls on room lighting – Goff and Green Meadow
  • Replacement of HVAC systems in main office – Red Mill
  • Replacement of existing Administration wing roof top mechanical equipment and installation of a new unit for the Conference Room area with modifications to associated HVAC ductwork systems – Genet
  • Replacement of hot water heater – Columbia
  • Reconditioning of smaller air conditioning chiller – Columbia
  • Modifications to the Technology Suite spaces – Goff
  • Reconstruction of Home & Careers Suite spaces – Goff
  • Provide additional structural support under the original building corridor floor and replace VCT flooring at the main entrance – Bell Top
  • Installation of added storm drainage and sump pump within the building’s back area crawlspace – DPS
  • Repair of parapet walls above roof deck and new flashing under precast concrete cap stones – Genet
  • Roof Deck exploratory work at selected locations to determine if repairs are necessary – Genet
  • Selected areas of exterior masonry repair – DPS and Red Mill
  • Reconstruction of main entry steps – Columbia
  • Reconstruction of west student parking area paving and sidewalks – Columbia
  • Reconstruction of service/north area paving – Goff
  • Expansion of student drop-off area – Goff
  • Reconstruction of lower parking lot pavement, drainage and retaining wall – Bell Top
Renovated bathroom at Genet

Second floor bathroom being renovated and made ADA-compliant at Genet Elementary School.

New bathroom at Genet under construction

A new bathroom being added at Genet Elementary School.

Roofing construction at Genet

Roofing repairs at Genet Elementary School.

Redesign of parking lot at Goff Middle School.

Redesign of parking lot at Goff Middle School.

Cabinetry replacement at Goff Middle School.

Classroom cabinetry replacement at Goff Middle School.

Replacement of bathroom at Green Meadow Elementary School.

Classroom bathroom being renovated and made ADA-compliant at Green Meadow Elementary School.

2021-22 School Year

  • Modify selected door locksets for improved intruder-prevention control – Columbia, Bell Top, DPS and Genet
  • Provision of daylighting controls on select room lighting and replacement of failing occupancy energy management master controls on lighting – Bell Top, DPS and Genet
  • Enhancements to exterior lighting – Bell Top, DPS and Genet
  • Reconditioning/replacement of selected windows – Genet
  • Modifications to undersides of main entry canopy – Columbia
  • Reconditioning of larger air conditioning chiller – Columbia
  • Replacement of main field event lighting, public address, and assistive listening systems and poles – Columbia

Summer 2022

  • Replacement of bathrooms with associated abatement, supply and waste piping, fixtures, finishes, etc. to provide code compliant toilet rooms – Bell Top
  • Creation of single-user code compliant bathrooms in hallway outside cafeteria with associated structural modifications, supply and waste piping, fixtures, finishes, etc. – Genet
  • Replacement of HVAC systems in office suites – Green Meadow and Red Mill
  • Replacement of hot water heaters – Genet
  • Refinishing of Gym flooring – Bell Top, DPS and Genet
  • Modifications to left and center area stair guardrail systems – Bell Top
  • Re-roofing of older asphalt shingle section of roofing system – Bell Top
  • Selected areas of pavement reconstruction – DPS and Genet
  • Reconditioning/replacement of selected windows – Genet
  • Provide new security doors between Central Administration area and Genet Elementary School area to improve student safety – Genet
  • Chimney masonry repair – DPS
  • Boiler room areaway foundation wall repair and new ladder – DPS
  • Modifications to undersides of select entry canopies – Columbia
  • Replacement of divider curtains in main gym – Columbia
  • Modifications to enlarge entry security vestibule – Columbia
  • Replacement of main athletic field synthetic turf, installation of additional sideline drainage – Columbia
  • Replacement of one ticket booth – Columbia
  • Modifications to STEM classroom – Columbia
  • Modifications to technology shop storage rooms – Columbia